DC1 - Middlewich
Lawlors were pleased to be appointed as Main Contractor to undertake the full refurbishment of DC1 to bring it up to a letable standard
Works included
- Demolition and removal of previous tenants installations
- Professional clean of all internal steelwork, lining panels, fixtures and fittings
- Removal and infill of all floor bolts, repairs to damaged floor surface, removal of line markings and professional clean of warehouse floor.
- Replacement of all dock doors and level access doors, curtains and associated equipment
- Repair / replacement of damaged cladding, infill of former openings, full industrial clean
- Decoration of structural steelwork
- Refurbishment of two storey office areas including new joinery, suspended ceilings, flooring and redecoration
- Complete Refurbishment of toilet blocks including new wall and floor tiling, sanitaryware, IPS, Cubicles and lighting
- Electrical and Mechanical re-commissioning and associated works
- Concrete yard repairs including repositioning of radius trief kerbing
- Repairs to blockpaving, jetwash, resanding and reinstatement of linemarking
'Thanks for all your hard work over the past few months! The project has gone very well from start to finish and the final product is of a very high standard'
Richard Nock, Senior Surveyor
More from Building Services
-
COVID Screens
Installation of COVID screens to NHS Health Centres throughout the Midlands
-
The Barn at Lichfield
Extensive Refurbishment of historic public house
-
Northcroft Hub - Erdington
Refurbishment of a live NHS Mental Health unit
-
DC4 - Corby
Refurbishment of 150,000 sq ft Distribution Unit
-
DC1 - Middlewich
Refurbishment of 185,000 sq ft Distribution Unit
-
The Fort - Birmingham
Refurbishment of 166,000 sq ft Distribution Unit
-
NHS Trust
Refurbishment of various Trust Properties throughout the Midlands area
-
Diddington Lane, Hampton In Arden
Design and Build of a 5 Bed Luxury Home
-
Halesfield 13 - Telford
Refurbishment of 10 industrial units
-
DC1 - Didcot
Refurbishment of 167,000 sq ft distribution unit
-
DC3 - Daventry
Refurbishment of 158,000 sq ft Distribution Unit